HardiePlank® Lap Siding Installation Guide
A plain-English summary of the manufacturer’s installation requirements, with links to the official documents.
Key Facts
- Installs over braced wood or steel studs at a maximum 24″ on center, or directly to minimum 7/16″ OSB sheathing.
- A code-compliant water-resistive barrier is required behind the siding; James Hardie assumes no responsibility for water infiltration.
- Use a 1¼” starter strip so the first course sits at the same angle as every course above it.
- Fasteners go 1″ down from the top of the plank and at least 3/8″ in from plank ends; plank butt joints are set in moderate contact with factory edges together.
- Maintain 6″ clearance to finished grade and 2″ to decks, paths, steps, roofs and driveways.
- Do not stain James Hardie products. Field paint or, better, have the boards factory pre-finished.
- HZ5 is engineered for freezing climates, HZ10 for heat and humidity. Installing HZ10 product outside an HZ10 zone voids the warranty.
What HardiePlank is
HardiePlank is James Hardie’s fiber cement lap siding — the most widely installed fiber cement product in North America. It comes in smooth, Select Cedarmill (wood grain) and beaded textures, in widths from 5¼” to 12″, and in two climate formulations: HZ5 for regions with freezing winters and HZ10 for hot, humid and coastal regions. Carolina Colortones stocks both and pre-finishes them in any color. See our fiber cement lap siding page for widths and exposures.
Installation summary (our reading of the James Hardie requirements)
Storage and handling. Store flat, dry and covered. Carry planks on edge. Installing wet planks can cause shrinkage at butt joints after the wall dries.
Cutting. Best: score-and-snap or fiber cement shears. Better: a dust-reducing circular saw with a HardieBlade and HEPA vacuum. Never use a power saw indoors, never dry-sweep, and follow the silica-dust precautions on the document.
Framing and sheathing. Studs at 24″ on center maximum, or 7/16″ OSB. Foam sheathing up to 1″ thick is acceptable but take care not to overdrive fasteners into it. Irregular framing telegraphs through the finished wall.
Water management. Water-resistive barrier with penetration and junction flashing per code. Finished grade must slope away from the house, typically 6″ in the first 10′. Kick-out flashing at roof-wall intersections.
Joints. Butt joints land off-stud or on-stud per the document; place factory-finished edges together and install in moderate contact. James Hardie does not recommend caulking field butt joints — use joint flashing behind them instead. Leave the appropriate gap at trim and caulk it.
Clearances. 6″ above grade, 2″ above decks, driveways, steps and roofing, 1″ between gutter end caps and siding.
Finishing. Primed product must be painted; do not use stain. Cut edges should be sealed.
What Carolina Colortones does with HardiePlank
We pre-finish every plank in our climate-controlled Western North Carolina facility — faces and edges — in any color from any major paint brand, with a 30-year solid-color finish warranty or a 15-year NWT stain-look finish that gives Cedarmill boards the look of stained wood (something you cannot do with field stain, which James Hardie prohibits). Boards arrive ready to hang; a touch-up kit ships free with every order.
Official documents
- James Hardie HardiePlank HZ10 Installation Requirements (PDF)
- HardiePlank HZ5 (PDF)
- HardiePlank Zone 10 (PDF)
Always confirm the current version at jameshardie.com and your HardieZone at hardiezone.com.
Get HardiePlank pre-finished in your color
Free samples ship anywhere in the continental United States. Every order is finished in our climate-controlled Western North Carolina facility.
Frequently Asked Questions
Can I install HardiePlank directly to studs without sheathing?
Yes, over braced studs at 24″ on center maximum with a water-resistive barrier, though 7/16″ OSB gives a flatter wall.
Do I caulk the butt joints?
James Hardie does not recommend caulk at field butt joints. Use joint flashing behind the joint and set the planks in moderate contact.
Can HardiePlank be stained?
Not in the field — James Hardie prohibits stain. Our factory NWT stain-look finish is the way to get a stained-cedar appearance on fiber cement.