LP® SmartSide® Panel & Lap Siding Installation Guide
A plain-English summary of the manufacturer’s installation requirements, with links to the official documents.
Key Facts
- Precision 38 and 76 Series panels go on 16″ o.c. framing only; 190 Series panels are required for 24″ o.c.
- Precision 3/8″ lap installs up to 16″ o.c.; 7/16″ lap up to 24″ o.c.
- Minimum 6″ clearance to grade, 1″ to porches, walks and roofing; siding must never touch masonry, concrete, brick, stone or stucco.
- Nails: 6d hot-dipped galvanized minimum for 38/76 panels, 8d for 190 panels and for lap; penetrate framing 1½”. No staples, no electroplated nails.
- Lap: blind-nail at the top, 1″ minimum overlap, 3/16″ gap at butt joints, joints on studs, sealed with a non-hardening paintable sealant (ASTM C920 Class 25).
- Prime and paint all exposed surfaces including drip edges and cut ends within 180 days. Semi-transparent stain, shake paints and vinyl-based paints are not recommended.
- SmartSide is treated with the SmartGuard borate process against termites and fungal decay.
What LP SmartSide is
LP SmartSide is engineered wood siding — wood strands bonded with resin, treated with zinc borate, and faced with a resin-saturated overlay. It is lighter than fiber cement, cuts with ordinary woodworking tools, and takes paint like wood. See our LP SmartSide lap siding page, board & batten and shake panels.
Installation summary — panels
Store flat, dry and off the ground. Match panel series to stud spacing (38/76 at 16″, 190 at 24″). Water-resistive barrier required (except SilverTech/SmartFinish panels on sheds). Nail 6″ o.c. at edges and 12″ in the field per the document; double-nailing is required to reach shear-wall values on 76 and 190. Z-flashing at horizontal joints, kick-out flashing at roofs, step flashing with a 4″ upper leg. Seal every gap.
Installation summary — lap
Studs to the span rating on the trademark. Blind-nail through the top of each course with the nail ¾” from the ends, 1″ overlap minimum, stagger butt joints on studs, 3/16″ gap at every butt joint sealed after install. Face nails must be caulked. Do not force boards into place.
Finishing
LP requires exposed substrate to be primed and painted within 180 days, including drip edges and every field cut. High-quality 100% acrylic latex is recommended. The document specifically excludes semi-transparent stain — the reason a factory stain-look finish is the only way to get a stained appearance on SmartSide.
What Carolina Colortones does with LP SmartSide
We pre-finish SmartSide lap, panel, trim and shake in solid colors or our NWT stain-look finish, on all faces and edges, before it ships — satisfying the 180-day rule before the product reaches the site. Pre-finishing is recommended by LP and keeps the 50-year substrate warranty intact.
Official documents
- LP SmartSide Precision Series Primed Panel Siding Application Instructions (PDF)
- LP SmartSide Precision Series Lap Siding Application Instructions (PDF)
- LP SmartSide Shake installation instructions (PDF)
- LP SmartSide Soffit installation instructions (PDF)
- LP SmartSide Trim & Fascia installation instructions (PDF)
- LP SmartSide Warranty (PDF)
LP SmartSide pre-finished in any color
Free samples ship anywhere in the continental United States. Every order is finished in our climate-controlled Western North Carolina facility.
Frequently Asked Questions
How do I install LP SmartSide 4×8 panels?
On 16″ o.c. framing (38/76 Series) over a water-resistive barrier, 6d galvanized nails penetrating framing 1½”, Z-flashing at horizontal joints, all gaps sealed, prime and paint cut edges. Full detail in the LP PDF above.
Can SmartSide be stained?
LP does not recommend semi-transparent stain in the field. Our factory NWT finish gives the stained look with an LP-approved coating system.
How soon does it have to be painted?
Within 180 days of installation — or before it arrives, if it is pre-finished.