Western Red Cedar Siding — Installation & Finishing Guide

A plain-English summary of WRCLA, NeLMA and USDA guidance, with links to the official documents.

Key Facts

  • Acclimate before installing: kiln-dried clears (12–15% MC) can go up on arrival; dry knotty siding needs 7–10 days stickered; green siding needs 30 days or more and narrower widths.
  • Store flat, off the ground, on stickers, under a vented waterproof cover — ideally indoors.
  • Finish all surfaces, including ends, before installation; factory-applied finishes perform best. End grain absorbs liquid up to 250 times faster than face grain, so every field cut must be sealed.
  • Nails: stainless steel is best; high-tensile aluminum is the economical choice; hot-dipped galvanized can stain under clear finishes. Never staples, electroplated or copper nails. Ring or spiral shanks hold better; blunt points reduce splitting.
  • Penetrate studs or blocking 1½” (1¼” with ring shank). Nail so boards can move; caulk with latex, polyurethane or polysulfide — not 100% silicone.
  • Install over building paper regardless of sheathing. Board-and-batten is vertical only; bevel, bungalow and drop patterns are horizontal only.
  • Oil-based semi-transparent stains are the finish of choice for fully exposed cedar (3–6 years); clear water repellents last 1–2 years; varnish is not recommended outdoors.

Before you start

Buy graded material and check it on arrival. Cedar shrinks and swells with moisture, so bring it to the local equilibrium before nailing. Wide roof overhangs, gutters, attic ventilation and a vapor barrier on the warm side of the insulation all protect the finish for years.

Installation

Nail locations depend on pattern; the principle is one nail per bearing so the board is free to move. Use the coverage factors from the USDA table to estimate material: bevel siding 1×6 needs a 1.33 factor, 1×8 1.28; tongue-and-groove 1×6 1.17; shiplap 1×8 1.16; add trim and waste. Bevel-cut ends on vertical installations so water sheds out. Diagonal installation channels water into joinery and must be designed for from the start.

Finishing

Penetrating finishes — oils, water-repellent preservatives, oil-based semi-transparent stains, bleaching oils and weathering stains — let cedar breathe and cannot peel. Film-forming finishes (varnish, latex semi-transparent) peel and demand heavy prep to recoat. Prefinishing is recommended in all circumstances: it stops the unfinished lines that appear when joints open in a dry season and prevents the adhesion loss that starts after two weeks of weather exposure.

What Carolina Colortones does with cedar

We pre-finish Western Red Cedar bevel, channel, T&G and board-and-batten on all six sides in Cabot and other premium systems — semi-transparent, semi-solid and solid — in our Western North Carolina facility. See our wood siding page and wood coating options.

Pre-finished cedar siding, all six sides

Free samples ship anywhere in the continental United States. Every order is finished in our climate-controlled Western North Carolina facility.

Frequently Asked Questions

Stainless steel first, high-tensile aluminum second. Avoid electroplated, copper and staples, and avoid hot-dipped galvanized under clear finishes.

Yes — finish all sides, edges and ends before installation, ideally at the factory.

3–6 years on rough-sawn cedar when fully exposed, longer under overhangs.